Loading…

Doosan Heavy Industries signed a contract with Korea Western Power to supply a gas turbine for the Gimpo Combined Heat and Power Plant in Gimpo, Gyeonggi Province, South Korea. The plant is to be constructed starting 2020 and completed in 2022, with the gas turbine to be delivered in 2021 for demonstration.
“두산중공업은 한국서부발전과 김포열병합발전소 가스터빈 공급계약을 체결했다고 23일 밝혔다.”etoday.co.kr
Summarized from public sources; check the original articles before acting on it.