Loading…

The Industrial Development Fund approved a loan of RUB 464.1 million to the Transport Electrical Equipment Plant in Naberezhnye Chelny to upgrade and expand production of EDU-133PCh electric motors for diesel locomotives. Total project budget is RUB 590.3 million.
“The production cost of the electric motors will be 25% lower than foreign ones and 7% lower than their domestic counterparts.”mpt.tatarstan.ru
Summarized from public sources; check the original articles before acting on it.