Loading…

Ansaldo Energia, with AC Boilers, won an order to design, build, supply, install and commission an 800 MW power train for the Edison Marghera Levante combined-cycle plant in Venice, Italy. The supply includes an H-class GT36 gas turbine, an HRSG from AC Boilers, and a 250 MW steam turbine.
“Ansaldo Energia con la collaborazione di AC Boilers si è aggiudicata l’ordine per la progettazione, costruzione, fornitura, montaggio in opera ed avviamento del “Power Train” da 800 MW per l’impianto Edison di Marghera Levante.”acboilers.com
Summarized from public sources; check the original articles before acting on it.