Loading…
Siemens Gamesa Renewable Energy signed a CNY240 million (USD34.8 million) equipment contract with Jiangsu FAW Foundry, a unit of Miracle Automation Engineering. Deliveries will be made between October 2019 and September 2020.
“Wind power sector leader Siemens Gamesa Renewable Energy has inked a CNY240 million (USD34.8 million) equipment contract with a unit of Chinese gear maker Miracle Automation Engineering.”yicaiglobal.com
Summarized from public sources; check the original articles before acting on it.