Loading…

MacLean Engineering completed a 1,400-m2 expansion of its Owen Sound, Ontario facility, doubling assembly capacity from five to ten bays. The project was initiated in Q4 2018 and completed in Q1 2019, with up to 60 new hires expected.
“Access to local trades is a big part of our challenge at MacLean: to keep up with the demand for specialized mining and municipal vehicles around the world.”e-mj.com
Summarized from public sources; check the original articles before acting on it.