Loading…
A Toshiba consortium won an EPC contract including civil engineering for replacement of the Goi Thermal Power Station, a 2,340 MW LNG-fueled combined cycle plant ordered by Goi United Generation LLC, with operation expected from 2024 to 2025.
“The Goi Thermal Power Station will be an LNG-fueled combined cycle power plant with a power output of 2,340 MW”global.toshiba
Summarized from public sources; check the original articles before acting on it.