Loading…
GE delivered and synchronized the first steam turbine for the 1,320 MW CPHGC power plant in Lasbela, Pakistan, three months ahead of schedule. The turbine was supplied under a 2016 EPC contract with NWEPDI and TEPC.
“CPHGC is the first overseas thermal power project developed by State Power Investment Corporation (SPIC) under the Belt & Road Initiative.”ge.com
Summarized from public sources; check the original articles before acting on it.