Loading…
Elgaugol is assembling two powerful excavators at its Elga coal complex, supplied by Uralmashzavod. Investment totaled 1.8 billion rubles. The EKG-18 excavator will be completed in late January 2019, and the ESh 20-90 C excavator is scheduled for commissioning in June 2019.
“These are the first excavators with the ladle of 18 and 20 cubic meters at Elga.”metalukraine.com
Summarized from public sources; check the original articles before acting on it.