Loading…

The Prime Minister approved the second phase of Long Son cement plant, adding two production lines (lines 3 and 4) each with a capacity of 2.3 million tonnes of cement per year. Line 3 is expected to begin operation in 2020 and line 4 in 2021.
“The Prime Minister agreed to add the second phase of the Long Son cement plant with two production lines”en.vietstock.vn
Summarized from public sources; check the original articles before acting on it.