Loading…
KEPCO KPS (Korea Electric Power Corporation KPS) has signed a KRW 17.06 billion contract with Korea Western Power for routine maintenance of electrical and mechanical equipment at Taean Thermal Power Plant. The contract was signed on December 4, 2018.
“한전KPS(051600)는 공사수주(2018년도 태안화력 기전설비 경상정비공사)에 관한 단일판매ㆍ공급계약체결(자율공시)를 5일에 공시했다.”biz.heraldcorp.com
Summarized from public sources; check the original articles before acting on it.