Loading…

Enel Green Power awarded Vestas a 294 MW order for V136-4.2 MW turbines for the Karusa and Soetwater wind parks in South Africa's Western Cape Province. The contract includes supply, installation, commissioning, and a 5-year service agreement. Turbine delivery and installation are planned for the second half of 2020.
“Enel Green Power has awarded Vestas a 294MW order of V136-4.2 MW turbines, delivered in 4.2 MW Power Optimised Mode, for two projects in South Africa.”esi-africa.com
Summarized from public sources; check the original articles before acting on it.