Loading…

Magna Tyres nearly doubled production capacity at its Hardenberg factory in the Netherlands, six months after opening the facility in January 2018, to meet growing demand for 26.5R25 and 29.5R25 OTR tyre sizes.
“New capacity has since been added to keep up with demand for the new sizes.”meconstructionnews.com
Summarized from public sources; check the original articles before acting on it.