Loading…
Wärtsilä has been selected to provide generating equipment for a 145 MW gas-fired power plant in Kyaukse township, Mandalay region, Myanmar. The order was placed by SEPCOIII Electric Power Construction, and the plant is scheduled to be operational in Q1 2019.
“The power plant will operate on eight Wärtsilä 50SG gas fuelled engines, and the electricity generated will be fed into the national grid.”offshore-energy.biz
Summarized from public sources; check the original articles before acting on it.