Loading…
Russelectric was awarded a contract to supply Charlotte Water with paralleling switchgear for water and wastewater treatment facilities in Charlotte, NC. Delivery for the initial system is scheduled for late 2018, with the second for early 2019.
“Russelectric manufactures complete systems in-house, with all bus, enclosures, and other structural components fabricated and fully assembled in Russelectric plants here in the US.”waterworld.com
Summarized from public sources; check the original articles before acting on it.