Loading…

Nippon Steel & Sumitomo Metal Corporation will install a new continuous galvanizing line (CGL) at its Kimitsu Works in Kimitsu, Chiba, Japan, to produce 1.5 GPa-grade ultra-high-tensile steel sheets. The line will have a capacity of 33,000 tonnes per month and is scheduled to start production in the second quarter of fiscal 2020.
“新CGLは、強度1.5GPa級の超ハイテン鋼板の製造が可能で、生産能力は月産33千トン、2020年度第2四半期の生産開始を目指します。”nipponsteel.com
Summarized from public sources; check the original articles before acting on it.