Loading…
Nippon Steel & Sumitomo Metal Corporation and Mitsui & Co. were awarded a 600,000-ton order for large diameter welded steel pipe and plate for the Sur de Texas–Tuxpan natural gas pipeline in Mexico, from the TransCanada/IEnova consortium. Shipping is scheduled from September 2016 to May 2017.
“Nippon Steel & Sumitomo Metal Corporation (NSSMC), together with Mitsui & Co., Ltd. (Mitsui), have been awarded a 600,000 ton steel order consisting of large diameter welded steel pipe and plate as raw material for the pipeline”vnsp.nipponsteel.com
Summarized from public sources; check the original articles before acting on it.