Loading…
Brückner built a new 25,000 sqm production site near Tittmoning, Germany, with advanced crane systems and production technology, to meet strong demand. Groundbreaking was in September 2016, and production moved in November 2017.
“The ground breaking in September 2016 was followed by a one-year construction period. In November 2017 Brückner began step by step to move the production to the new production site.”textileworld.com
Summarized from public sources; check the original articles before acting on it.