Loading…
Siltbuster Process Solutions installed two HB300 lamella systems to treat backwash waters at South West Water's £60 million Mayflower Water Treatment Works in Plymouth, UK. The project is delivered by Balfour Beatty and Interserve.
“Two Siltbuster HB300 lamella systems have been installed to remove particulate material being generated during the backwashing process.”waterbriefing.org
Summarized from public sources; check the original articles before acting on it.