Loading…
GE Power won a Rs 220 crore order to supply a 6F.03 gas turbine and generator for a captive power plant at HPCL's Visakhapatnam refinery in Andhra Pradesh. The order was placed by BHEL, the principal contractor, and is part of HPCL's refinery expansion from 8.33 to 15 MTPA.
“US multinational GE Power on Tuesday said it has won a Rs 220-crore order to supply a gas turbine and generator for the proposed captive power plant”cnbctv18.com
Summarized from public sources; check the original articles before acting on it.