Loading…

Teshmont Consultants provided protection and control design engineering and testing services to General Electric Canada for the construction of the Adelaide Substation in downtown Winnipeg, a 66/12 kV substation for Manitoba Hydro. Construction began in May 2015 and was recently completed.
“By applying tried-and-true engineering practices with innovative technology, we're ensuring that the Adelaide Substation will provide a great deal of benefit to downtown Winnipeg for the foreseeable future.”newswire.ca
Summarized from public sources; check the original articles before acting on it.