Loading…
Siemens Canada, with Mortenson Construction, signed an $800 million contract with Manitoba Hydro to design and build two converter stations and a 500 kV overhead line for the Bipole III HVDC Reliability Project.
“Siemens Canada will design and build, with Mortenson Construction, two converter stations and all core equipment for their functioning, as well as the 500 kilovolt overhead line connecting the stations, for Manitoba Hydro.”ediweekly.com
Summarized from public sources; check the original articles before acting on it.