Loading…
Woojin signed a 3.83 billion won contract with Korea Hydro & Nuclear Power (KHNP) to supply assembly cables for the Shin-Kori 5 and 6 nuclear reactors. The contract runs until May 31, 2021.
“우진은 한국수력원자력과 신고리 5ㆍ6호기 조립케이블 공급계약을 체결했다고 2일 공시했다.”biz.heraldcorp.com
Summarized from public sources; check the original articles before acting on it.