Loading…
Beijing OriginWater Technology Co., Ltd. has won a 930 million yuan contract for equipment procurement and installation of the Wuhan Beihu wastewater treatment plant, the largest in central China. The plant will use OriginWater's MBRU membrane modules, with an initial capacity of 800,000 tons per day and a future capacity of 1.5 million tons per day.
“碧水源中标华中地区最大的污水处理厂——武汉市北湖污水厂(又称:四厂合一)设备采购及安装PC总包项目。”membranes.com.cn
Summarized from public sources; check the original articles before acting on it.