Loading…

LS Cable & System Ltd. won a KRW 124.3 billion ($103 million) contract to supply HVDC power cables for South Korea's first land HVDC power grid, connecting Dangjin and Pyeongtaek.
“LS C&S will supply high-voltage, direct current (HVDC) power lines for the nation's land power grid system”pulse.mk.co.kr
Summarized from public sources; check the original articles before acting on it.