Loading…
IRC Limited announced that the ball mill at its K&S processing plant is operating at 75% of full capacity during trial runs, with full production expected in early 2017.
“K&S的投产计划现正取得具体进展,加工厂球磨机于其75%全面产能试运中运作,预期2017年初全面投产及进行商业生产。”beta.zhitongcaijing.com
Summarized from public sources; check the original articles before acting on it.