Loading…
Samsung Austin Semiconductor's Fab 1 at its Taylor, Texas campus, with an initial minimum investment of $17 billion, is on track to be operational by the end of 2026. The 1,200-acre campus includes a six-floor office building and cleanroom the size of six football fields.
“With an initial minimum investment of $17 billion, Fab 1 is on track to be operational by the end of 2026.”semiconductor.samsung.com
Summarized from public sources; check the original articles before acting on it.