Loading…
Weir Group won an order to supply 14 GEHO TZPM 2000 positive displacement pumps to Lloyds Metals and Energy for the second phase of its slurry pipeline at the Surjagarh mine in Maharashtra, India. No financial value was disclosed.
“The Glasgow-based engineering company will supply 14 GEHO TZPM 2000 positive displacement pumps equipped with GEHO Load Reduction System.”lse.co.uk
Summarized from public sources; check the original articles before acting on it.