Loading…
Baker Hughes won a contract from Turkish Petroleum (TPAO) and TP-OTC to supply subsea production and intelligent completion systems for Phase 3 of the Sakarya Gas Field in the Black Sea, with deliveries expected from late 2025.
“Baker Hughes will deliver deepwater horizontal tree systems, subsea structures, and advanced control systems to support gas production.”worldoil.com
Summarized from public sources; check the original articles before acting on it.