Loading…
Hanwha Power Systems announced it signed a supply contract in August 2025 to deliver CO2 Mechanical Vapor Recompression compressors for a carbon capture facility at a new combined-cycle power plant in Europe. Commercial operations are scheduled to begin at the end of 2028.
“Hanwha Power Systems announced that it has signed a supply contract last month to deliver CO₂ Mechanical Vapor Recompression (MVR) compressors”bastillepost.com
Summarized from public sources; check the original articles before acting on it.