Loading…

LinkSolution signed a 1.4331 billion won ($1.07 million) contract with Hanwha Aerospace for development and verification of additive manufacturing process parameters for lunar lander engines and thrusters. The contract runs from September 29 to December 31, 2026.
“LinkSolution announced in a regulatory filing on the 30th that it has signed a single sales and supply contract worth 1.4331 billion won with Hanwha Aerospace.”cbcglobe.com
Summarized from public sources; check the original articles before acting on it.