Loading…

All Metals Fabricating announced a second facility with an initial 40,000 sq ft footprint, optimized for data center sheet metal fabrication and precision machining. The facility is expected to be operational by early December 2026, with $7 million in equipment added in Phase 1.
“We’re excited to announce the addition of a second facility, with an initial footprint of 40,000 square feet and significant room for expansion.”ametals.com
Summarized from public sources; check the original articles before acting on it.