Loading…
Chengdu Changyue Mechanical Engineering Co., Ltd. won a contract to supply a 40.5T-45m rail-mounted container gantry crane to Heshan Hegang Freight Co., Ltd. for CNY 10,226,500. The crane is to be delivered and installed within 180 days of contract signing.
“鹤山市鹤港货运合营有限公司40.5T-45m轨道式集装箱门式起重机采购项目结果公告”taohuabao.com
Summarized from public sources; check the original articles before acting on it.