Loading…
Datang Group's 4×660MW coal power project in Hanggin Banner, Inner Mongolia, has announced Shanghai Electric Group as the first candidate for turbine-generator supply (CNY 1.385 billion) and Harbin Boiler Company as the first candidate for boiler supply (CNY 1.56 billion). The project is scheduled to start construction in September 2026, with units coming online between November 2028 and May 2029.
“该项目位于内蒙古自治区鄂尔多斯市杭锦旗独贵塔拉镇,建设规模为2640MW。”guancai.lgmi.com
Summarized from public sources; check the original articles before acting on it.