Loading…
Sandvik's production unit in Seremban, Malaysia, which was inaugurated in May 2024 with an investment of approximately SEK 350 million, is ramping up production of underground load and haul equipment. Manufacturing of the Toro TH663i truck is scheduled to begin in 2026. The facility currently employs about 100 people.
“No matter where our equipment is assembled, it is built to the same Sandvik specifications and global standards.”mining.sandvik
Summarized from public sources; check the original articles before acting on it.