Loading…

Dongfang Electric plans to add a new production line in 2026 for G50 gas turbines, increasing annual production capacity to 10 units of 50MW gas turbines, as current production is scheduled through end of 2027.
“企业计划 2026 年新增产线,投产后年产能将达到 10 台 50MW 燃机。”finance.sina.cn
Summarized from public sources; check the original articles before acting on it.