Loading…
ABB won an order from Portsmouth International Port to supply a shore connection system for ferries and cruise ships under the port's Sea Change project. The system is due for installation in Q4 2024 and operation by Q2 2025.
“ABB has won an order with Portsmouth International Port to supply a shore connection solution for visiting ferries and cruise ships as part of the UK port's Sea Change project.”offshore-energy.biz
Summarized from public sources; check the original articles before acting on it.