Loading…

Power Mech Projects bagged a ₹2,500 crore order from Bharat Heavy Electricals for the Balance of Plant (BoP) Package on EPC basis for the 1x800 MW Singareni TPS, Stage-II in Mancherial, Telangana. The project is expected to be completed in 38 months.
“The company has bagged the Balance of Plant (BoP) Package on EPC basis for 1x800 MW Singareni TPS, Stage-II.”thehindubusinessline.com
Summarized from public sources; check the original articles before acting on it.