Loading…
Power Mech Projects secured a Rs 2.94 billion contract from Adani Power for overhauling and performance guarantee testing of steam generators and turbine generators at the 2x660 MW Korba Phase-II thermal power project in Chhattisgarh.
“Power Mech Projects Limited has secured a Rs 2.94 billion contract from Adani Power Limited (APL) for the overhauling and performance guarantee testing of steam generators, steam turbine generators, and their auxiliaries at the 2x660 MW Korba Phase-II thermal power project.”powerline.net.in
Summarized from public sources; check the original articles before acting on it.