Loading…

Paladin Energy is adding new mining equipment at the Langer Heinrich Mine in Namibia, including 100-tonne trucks and 150-tonne excavators already on site, with 150-tonne trucks and Hitachi EX2600 excavators arriving by year-end. The full fleet is expected operational in H2 FY26.
“Paladin Energy expects the full fleet to be operational in the second half of FY26, enabling a shift from medium-grade stockpiles to prime ore feed.”theextractormagazine.com
Summarized from public sources; check the original articles before acting on it.