Loading…
Borouge extended the deadline for EPC bids for a project to increase butene-1 production at its Borouge 2 plant in Abu Dhabi from 39,000 to 60,000 tonnes per year, with EPC contract award planned for Q1 2026.
“Borouge aims to produce 60,000 tonnes a year (t/y) of butene-1 from the existing fractionator column, while limiting propylene production from the OCU to 500,000 t/y.”guest.meed.com
Summarized from public sources; check the original articles before acting on it.