Loading…

Preformed Windings opened a new 11,000-square-foot manufacturing facility in Sheffield, UK, on December 6, 2024, increasing production capacity by 60% for high-voltage diamond coils.
“The new unit, a 11,000-square-foot addition to the company’s existing 19,000-square-foot site, increases production capacity by 60% to meet rising global demand.”waterpowermagazine.com
Summarized from public sources; check the original articles before acting on it.