Loading…

Yokogawa Europe has been awarded the front-end engineering design (FEED) contract for the control, telecoms, and system integration of the Aramis Transport System, a carbon capture and storage project in the Port of Rotterdam. The FEED design is expected to be ready in 2024.
“Yokogawa Europe has been awarded the tender for the front-end engineering design (FEED) phase for the control, telecoms, and overall system integration of the Aramis Transport System.”oilgastechnology.com
Summarized from public sources; check the original articles before acting on it.