Loading…
Tata Steel has signed a contract with Tenova to supply a 3-million-tonne-per-year electric arc furnace and ladle metallurgy furnaces for its Port Talbot site in Wales, UK. The EAF, commissioned from end of 2027, will reduce carbon emissions by 90%.
“Tata Steel has today signed a contract with Tenova – a world leading metals technology manufacturer – to deliver a state-of-the-art electric arc furnace and additional advanced steelmaking equipment for its Port Talbot site in Wales, UK.”tatasteeluk.com
Summarized from public sources; check the original articles before acting on it.