Loading…
GE Power India Limited has bagged an order from NTPC Limited to supply main turbine spares for the Talcher plant in Odisha, India, valued at INR 1.87 crore, to be fulfilled over 9.5 months.
“GE Power India Limited has bagged an order from NTPC Limited to supply main turbine spares for the Talcher plant in Odisha.”projectxindia.com
Summarized from public sources; check the original articles before acting on it.