Loading…

ZIEHL-ABEGG celebrated the grand opening of a new production and logistics headquarters in Winston-Salem, North Carolina, with an investment of EUR 100 million. The facility spans 48,500 m² and can produce up to 800,000 fans per year.
“We’ve built this facility with the future in mind. It’s designed to be flexible and adaptable, so we can continue to innovate and meet the evolving needs of our customers.”fanpost.ziehl-abegg.com
Summarized from public sources; check the original articles before acting on it.