Loading…

Hystar awarded thyssenkrupp Automation Engineering a Front-End Engineering Design (FEED) contract for an automated 4.5 GW electrolyser manufacturing line at its GW factory in Høvik, Norway.
“Hystar AS today announces it has awarded German industrial engineering company thyssenkrupp Automation Engineering with the Front-End Engineering Design (FEED) contract for the supply of Hystar's automated electrolyser manufacturing line for its GW factory in Høvik, Norway.”hystar.com
Summarized from public sources; check the original articles before acting on it.