Loading…

LG Water Solutions secured a contract to supply over 23,000 SW 440 GR G2 seawater reverse osmosis membranes to GS Inima for the Ghubrah III Desalination Plant in Muscat, Oman. The plant will have a capacity of 300,000 m³/day and is expected to be commissioned in Q1 2027.
“LG Water Solutions is set to boost Oman’s water infrastructure, having secured a contract to supply over 23,000 of its SW 440 GR G2 seawater reverse osmosis (SWRO) membranes to the Ghubrah III Desalination Plant.”smartwatermagazine.com
Summarized from public sources; check the original articles before acting on it.