Loading…
Emerson is building an innovation and manufacturing hub at King Salman Energy Park (SPARK) in Saudi Arabia, to provide control systems engineering, testing and manufacturing of DP transmitters, control valves and solenoid valves, slated to open by December 2024.
“The facility, which is slated to open by December 2024, will provide industrial customers in the region with services for control systems engineering.”constructionweekonline.com
Summarized from public sources; check the original articles before acting on it.