Loading…

VAHLE has received an order to equip 16 container blocks with automation systems at the new CMA Terminals Khalifa terminal in Abu Dhabi, including 22 km of conductor system and telescopic arms for 20 eRTG cranes. The terminal is a joint venture between CMA Terminals (70%) and AD Port Group (30%).
“The first phase of the new electrification project, which will start in summer 2024, involves equipping 16 container blocks with VAHLE automation systems.”worldcargonews.com
Summarized from public sources; check the original articles before acting on it.