Loading…
Wärtsilä will supply 34DF dual-fuel engines for two new U.S. power plants ordered by a major investor-owned utility in the Upper Midwest, totalling 75 MW from eight engines. The order was booked in November 2022 and announced on 10 January 2023.
“We are pleased to have been awarded these contracts.”wartsila.com
Summarized from public sources; check the original articles before acting on it.